Foto: Josef Hanss , Bad Wurzach

Center Parcs Allgäu

Holiday homes

Location

Allgäuallee 40, 88299 Leutkirch im Allgäu

Construction year

2018

Project description
750 foundation slabs in steel fibre reinforced concrete for holiday homes at Center Parcs
in Allgäu.
Optimisation with SFRC
  • Elimination of the planned reinforcement Ø12/12 cm crosswise at the top and bottom
  • All 750 No. planned foundation slabs could be designed without traditional mesh or rebar.
  • Thanks to the use of steel fibre reinforced concrete, the "small" construction company was
    able to apply not only for the first but also for the second construction lot of tender
    (375 foundation slabs per lot).
  • This enabled a "small" construction company to carry out an area of 53,000 m² with about 14,000 m³ of concrete with a handful of employees
  • Despite large distances to the construction area, the steel fibre reinforced concrete could be pumped without any problems
Slab thickness

25 cm

Execution

fibre only

Concrete

C25/30

Performance class

L1,2/1,2

Fibre type

Dramix® 3D 55/60BL

Owner

Center Parcs Leisure Deutschland GmbH

Building contractor

Gordian Mösle GmbH

Original solution

WP Ingenieure Partnerschaft Beratender Ingenieure mbB, Hamburg

Cubature

ca. 14.000 m³

Barleben, P.
750 Fundamentplatten – Center Parcs baut auf Stahlfaserbeton
Bautechnik Heft 11, November 2018. / www.ernst-und-sohn.de
Download PDF

back to the list of projects:

Get in touch with our Team!

By phone, email or via social networks:
We are here for you.

Falconix Engineering GmbH
Siemensstraße 24
61267 Neu-Anspach
Germany