City Prag

Living at Theaterviertel BA1 - BA3

Location

Maybachstraße 10A, 10B, 12A-G, 14, Stuttgart-Feuerbach

Construction year

2019

Project description

Combined reinfocement for the foundation slabs for the residential buildings at Theaterviertel BA1 - BA3.

 
Optimisation with SFRC
  • The construction process was speeded up due to the use of combined reinforcement
  • Reduction of crack width-limiting reinforcement by more than half -> optimal constructability / economic aspect
Slab thickness

70 - 100 cm;

Execution

combined reinforcement

Concrete

C35/45

Performance class

L1,8/1,8

Fibre type

Dramix® 4D 65/60BG

Owner

Instone Real Estate Development GmbH, Stuttgart

Original solution

Fritz Deufel Ingenieurgesellschaft mbH , Deizisau

Floor area

ca. 8.300 m²

Cubature

ca. 8.000 m³

back to the list of projects:

Get in touch with our Team!

By phone, email or via social networks:
We are here for you.

Falconix Engineering GmbH
Siemensstraße 24
61267 Neu-Anspach
Germany