NKL Düsseldorf
Living at Niederkasseler Lohweg 20
Location
Niederkasseler Lohweg 20, 40547 Düsseldorf
Construction year2018 — 2023
Project descriptionCombined reinforcement for the foundation slabs for the project living at Niederkasseler Lohweg "NKL" in Düsseldorf.
Optimisation with SFRC
- The construction process was speeded up Speed up due to the use of combined reinforcement
- Optimisation/reduction of slab thicknesses by 10 -30 cm compared to the original solution
- Reduction of the crack width-limiting reinforcement by more than half -> optimal constructability / economic aspect
Slab thickness
38 - 120 cm
Executioncombined reinforcement
ConcreteC30/37
Performance classL1,8/1,8
Fibre typeDramix® 4D 65/60BG
Owner
Instone Real Estate Development GmbH, Köln
Original solutionWSK Ingenieure GmbH, Düsseldorf
Floor areaca. 6.000 m²
Cubatureca. 3.300 m³