Grafik: S. Engel Engineers Ltd.

Tel Aviv

Location

Stadtzentrum Tel Aviv, Israel

Construction year

2023 — 2024

Project description

Combined reinforcement for the foundation slab of a 15-storey commercial building.

Optimisation with SFRC
  • Optimisation/reduction of the slab thickness compared to the original solution
  • Use of steel fibres primarily due to crack width limitation and increase of punching resistance (elimination of punching strips)
  • Logistical advantage due to cramped space in the middle of the city of Tel Aviv
Slab thickness

100 - 150 cm

Execution

combined reinforcement

Concrete

B45 (C35/45)

Dosage

35 kg/m³

Fibre type

Dramix® 4D 65/60BG

Original solution

S. Engel Engineers Ltd.

Cubature

ca. 7.000 m³

back to the list of projects:

Get in touch with our Team!

By phone, email or via social networks:
We are here for you.

Falconix Engineering GmbH
Siemensstraße 24
61267 Neu-Anspach
Germany