Wellpappformatwerk PW15
Sheet factory PW15
Location
Jakob Preißer Weg, 66989 Petersberg
Construction year2023
Project descriptionApprox. 20,000 m² jointless industrial floor with a thickness of 25 cm for the sheet factory in Petersberg.
Optimisation with SFRC
- Due to very high loads caused by upright paper rolls, the design in steel fibre reinforced concrete in combination with traditional reinforcement was favoured
-
Additional reinforcement was also required to satisfy the client need for a 0.3 mm crack width calculation
Slab thickness
25 cm
Executioncombined reinforcement
ConcreteC30/37
Performance classL1,8/1,8
Fibre typeDramix® 5D 65/60BG
Owner
Progroup AG
General contractorPeter Gross Infrastruktur GmbH & Co. KG
Floor areaca. 20.000 m²
back to the list of projects: