Project description

In Sondershausen, a foundation slab was constructed in combined reinforcement. The foundation slab is divided into 3 areas: HRL, AKL and Shuttle. For each area, the deformations in the ULS (Ultimate Limit State) should be limited. For example, the angle of twist in the HRL area must not exceed α = 0.5 mrad at any point of the floor slab. The maximum permissible local vertical deformation up to a length of 3 m is limited to 1/2,500.
The exact rotation determination was carried out using non-linear calculation methods.

Optimisation with SFRC
  • Significant reduction of the slab thickness from 160 cm to 90 cm due to the use of steel fibre reinforced concrete and the non-linear design method -> enormous cost saving
  • Reduction of the crack width-limiting reinforcement -> significant reduction of the construction time
  • Seamless construction of the slab (i.e. with no movement joints) was possible due to steel fibre reinforced concrete
  • The subsoil could be optimised due to the non-linear analysis -> high economic aspect and shortened construction time
Slab thickness

90 cm

Execution

combined reinforcement

Concrete

C30/37

Performance class

L1,8/1,8

Fibre type

Dramix® 5D 65/60BG

Owner

WAGO GmbH & Co. KG

Original solution

BauStatik Radin, Lippstadt / Thessaloniki

Floor area

ca. 4.550 m²

back to the list of projects:

Get in touch with our Team!

By phone, email or via social networks:
We are here for you.

Falconix Engineering GmbH
Siemensstraße 24
61267 Neu-Anspach
Germany